Carry out need assessment, planning, implementation, monitoring & evaluation of community development projects; gravity water supply system /rainwater harvesting and sanitation, total sanitation through CLTS approach, surface irrigation, community suspended bridge, school physical improvement program, community school support program, in cooperation with Government of Nepal and INGOs.

Design & conduct various participatory trainings: community capacity building, total sanitation through CLTS, caretaker training (Plumbing/Mason), orientation on water safety plan, water resource management and sanitation training, as well as ToT, PRA, SARAR, capacity building & skill development, gender awareness training and learn without fear campaign for creating child friendly learning environment in schools etc.

Feasibility study, surveying, design & cost estimate, implementation, supervision & monitoring of water supply & sanitation projects, School buildings, School toilet, Irrigation and suspended bridge construction etc.
Campaigning for learn without fear environment in schools of Makawanpur.

Support to improve education quality through infrastructure improvement program.

Participatory vulnerability assessment of the infrastructure development community projects

Partnership
RADO-Nepal has been working in Makwanpur district with multiple partners; INGOs and government of Nepal. RADO-Nepal has partnership with Plan Nepal since 2002 in the sector of Water, Sanitation and hygiene (WASH); community capacity building and technical support in gravity and rainwater harvesting drinking water schemes, total sanitation through community led total sanitation (CLTS) approach to declare the communities/VDCs open defecation free (ODF). Besides this, RADO-Nepal is also in the joint partnership with the Department of Education (DOE) and Plan Nepal on social and technical support for School Physical Improvement Program (SPIP).

RADO-Nepal has also completed 3 Water and sanitation projects in partnership with (World Bank Funded Project) RWSSFDB covering 371 households in Makwanpur in first phase.

RADO-Nepal has partnership with District Development Committee (DDC) and BBLL/TBSU with financial support of Helvetas since 2005 for implementation of suspended bridge construction in Makwanpur district. There is also partnership with TEARFUND UK based organization for WASH and Shelter construction.

SUMMARY OF PROGRAMME IMPLEMENTED IN MAKAWANPUR (April 2002 – June 2022)

S.N.     Name of the Program/Finding Agency     Nos. of project   No of Municipalities covered       Beneficiaries     Output   Program support Cost/’000    Funding Agency
  A. Water Supply System -Gravity flow pipe system – New Schemes            
1 Plan International Nepal 148 10 6827 HHs 2688 Taps 93407 Including HH Connection
2 RWSSFDB 3 1 371 HHs 59 Taps 5184 Public Tap
3 Raleigh International Nepal 2 2 62 HHs 43 Taps 1823 HH Connection
4 Tearfund 1 1 54 HHs 46 Taps 1700 Public tap
5 Rotary Foundation 1 1 175 HHs 175 Taps 6000 HH Connection
  B. Rainwater Harvesting (RWH)            
1 RWH system-Jars 38 11 1013 HHs 1043 Jars 41800 Plan Int. Nepal
  C. Repair/Maintenance of Water supply schemes            
1 Plan International Nepal 57 10 2438 HHs 728 Taps 12651 Including HH Tap
2 Tearfund 9 1 507 HHs 123 Taps 6000  
3 Raleigh International Nepal 13 3 587 HHs 223 Taps 6931 Including HH tap
  D. Other Construction Support            
1 School/Toilet building 53+27 Schools Schools Class room/Toilet 62600 Plan International
2 TS /CLTS -ODF/PODF 13 17666 HHs 9348 toilets added 10147 Plan Int. Nepal
3 School-WASH 92 29 School 92 3529 Plan Int. Nepal
4 Cooperative Building 33 19  Nos 33 9220 Plan Int. Nepal
5 Surface Irrigation   66 18 Nos 93 Hector 9700 Plan Int. Nepal  
6 Market Shed/VCC 17 10 Nos 17 Building 1720 Plan Int. Nepal  
7 School Physical Improvement Program 500 District Mk 4 Roomed-92, 2 Roomed-325, Toilet – 638 490575 DEO/DoE/Plan International
8 LWF Campaign 488 District School 492 Times 6150 Plan International
9 Trail Bridge support program 53 10 Mk   116726 Helvetas/TBSU/DDC/Municipalities
10 TLC in Schools 5 2 Schools 5 500 Tearfund and
11 TLC in Schools 47 10 Schools 47 10200 Plan Int. Nepal
12 WASH in TLCs 33 10 Schools 33 2640 Plan International
13 Water and MHM kit distribution   6 HHs 6000 HHs 500 Plan International
14 Winterization materials Distribution   10 HHs 6064 HHs 9000 Tearfund International
15 Model House Construction 1 2 HHs 38 17100 Tearfund
16 Housing reconstruction   2 HHs 585 146250 Tearfund
17 WASH improvement in Schools 10 Schools 69 21500 Unicef Nepal

SUMMARY OF FINANCIAL HISTORY (Last five years)

Financial turnover of organization in the past five years (as per financial audit)

Year Total Budget (NRs.) Development Partners
2074/75 92,545,923.84 Tearfund, Plan Intl., Raleigh, Unicef, Municipalities of Makawanpur
2075/76 54,091,112.00 Plan Intl., Raleigh, Unicef, Municipalities of Makawanpur
2076/77 42,544,779.00 Plan Intl., Raleigh, RWSSFDB, Municipalities of Makawanpur
2077/78 41,882,440.00 Plan Intl., Raleigh, RWSSFDB, Municipalities of Makawanpur
2078/79 72,424,093.00 Plan Intl., Raleigh, SWA, ENphO, Municipalities of Makawanpur